Location: Tampa, FL
Project Duration: 3 months
Project Cost: $7,000,000
Facility Size: 88,000 square feet
The conversion of a nineteenth century, national landmark Tampa cigar factory, to a state- of-the- art training and conference center, provided an exciting challenge for the Nova staff. The utmost attention was focused on the preservation of the building’s original attributes, including its brick façade, embossed tin paneled ceilings, rod iron accents, and lead windows. A new mechanical, electrical, and plumbing system was installed along with modern flooring, walls, and high-end finishes throughout the facility. The new 90,000-square-foot conference center features an extensive millwork package, a modern film room, and full service health spa.